35 Years of Noteworthy Projects
2013 Staunton, Illinois
Supplied 41 skid mounted peristaltic chemical feed pumps along with all of the chemical tanks and
transfer systems.
..........................................................................................................................................................
2012 St. Charles, Missouri
Furnished two 14ft x 60ft Lime Silos with the newest High Density Liquid Calcium Hydroxide feed
systems.
..........................................................................................................................................................
2010 Holiday Shores, Illinois
Supplied a complete chemical feed system utilizing peristaltic metering pump technology on all chemical
feed applications for a new membrane plant.
..........................................................................................................................................................
2009 Steele, Missouri - 1000 gpmSupplied two 5000 GPM packaged Marlo Horizontal Filter treatment plants in Southern Missouri.
..........................................................................................................................................................
2006 Caterpillar Trails, Illinois
Designed and furnished new chemical feed systems including the new High Density 38% Lime System.
..........................................................................................................................................................
2005 Sparta, IllinoisSecond complete membrane water treatment plant in Southern Illinois.
..........................................................................................................................................................
2005 St. Charles, MissouriSold three MBR wastewater treatment plants in St. Charles County - Hwy. DD plant Duckett Creek, St.
Paul, Mo., and Foristell, Mo.
..........................................................................................................................................................
2004 Breese, IllinoisFirst membrane water treatment plant in Southern Illinois (completed 2005).
..........................................................................................................................................................
2003 West ChicagoSold the largest High Density (LCH) Liquid Lime Systems in Illinois.
..........................................................................................................................................................
2001 Laramie, WyomingDesigned and furnished new chemical feed systems including the new High Density 38% Lime System
..........................................................................................................................................................
1998 Collinsville, Illinois
Finished first Tonka Helicone in the State of Illinois.
.........................................................................................................................................................
1996 Collinsville, Illinois (Turnkey design/build)
Automated the Collinsville filter control to computer-based operation and re-habed their filter bays.
..........................................................................................................................................................
1994 Carmi, Illinois - 2000 gpmSupplied two 1000 gpm packaged Tonka duolator treatment plants, the largest of this type in Southern
Illinois.
..........................................................................................................................................................
1993 E.J. Water District, Illinois - 1000 gpmFurnished the first Tonka packaged duolator iron removal plants in Southern Illinois territory.
..........................................................................................................................................................
1992 St. Louis County Water Company; St. Louis, MissouriSupplying 1-1/2 million dollars worth of new chemical feed equipment, Brooks & Associates met special
design and installation needs of this customer through their broad range of experience and capabilities.
..........................................................................................................................................................
1991 Olin Ordinance; Marion, IllinoisDesigned and built a complete hazardous containment system for the Air Bag Sodium Azide Pilot
Production Facility. We were selected over large national companies from Phoenix and Memphis.
Meeting tremendous deadlines, Brooks delivered an operating system, under budget, in ninety-three
days.
..........................................................................................................................................................
1990 St. Marys, MissouriRehabilitated the Municipal Water Plant, reducing the iron content from over 15 MGL to less than 0.3
MGL and providing an exceptional level of water quality.
..........................................................................................................................................................
1989 GenCorp (General Tire) Berger, MissouriDesigned and built a complete Cyanide Destruction Facility, providing an automated operating system
in order to meet newly imposed discharge restrictions and keeping the factory operating.
..........................................................................................................................................................
1988 Boy Scouts of America Beaumont Scout Camp West, St. Louis County, Missouri
Furnished and installed new sewage treatment facilities and filtration equipment for water and
wastewater.
..........................................................................................................................................................
1987 Chaffee, Missouri
Furnished all the equipment for the water plant for a large iron and manganese removal plant utilizing
new GFC 'Antrasand System' in duplex multi cell horizontal pressure filter layout.
..........................................................................................................................................................
1986 Olney, IllinoisEngineer: Charleston Engineering
All plant equipment and control center for sewage treatment plant including the chemical feed systems.
..........................................................................................................................................................
1985 Monroe City, Missouri Water PlantFurnished all the equipment and control center for sewage treatment plant including the chemical
feed systems. First GF Pulsating Clarifier in the State.
..........................................................................................................................................................
1984 Brooks Hydro Sock System (Designed & Manufactured by Brooks & Associates)
A major improvement in tertiary treatment of wastewater systems under 200,000 GPD, providing both
lower initial and operating costs. Nominated for Innovative WEFTEC award.
..........................................................................................................................................................
1983 Saline Valley Water District, Illinois
Engineer: Brown & Roffman
Extensive radio telemetry monitoring and control system using digital technology. Lime silo and all
chemical feed systems.
..........................................................................................................................................................
1982 Illinois American Water Company, East St. Louis, Illinois
Engineer: American Water Works Service Company
All new pneumatic instrumentation automating the filter plant.1980 Fredericktown Missouri
Built by Stan Gilliam
Furnished all electrical/mechanical equipment for a new 3 MGD surface water treatment plant. The
system included a two-stage plant with an automated central station control.
..........................................................................................................................................................
1981 Pittsfield, IllinoisEngineer: Benton & Associates
All instrumentation and supervisory control system for sewage treatment plant, a first to use digital
transmissions.
..........................................................................................................................................................
1980 Fredericktown, Missouri Built by Stan Gilliam)
Furnished all the electrical/mechanical equipment for a new 3 MGD surface water treatment plant. The
system included a two-stage plant with an automated central station control.
..........................................................................................................................................................